AHC-PZ4C-T82W
internal project · Atlas HydroCorp · active · opened
M3.231.401
Scope
Relay HL-9, a water-purification station in the jungle highlands of Terra-Forge, has gone dark. Atlas is restoring it with its own people rather than putting the work out.
The colony downstream is on stored water. Atlas has not said for how long.
Owner / Coordinator
- Atlas HydroCorp — water reclamation. It does not subcontract remediation on its own infrastructure if it can avoid it
- Darius Mott, logistics coordinator, is running it. He sounds more desperate than corporate, which is not how an internal project is supposed to sound
Status
Active, and has been since M3.231.401. An internal remediation that stays open this long is either harder than it looked or being handled by people who are not equipped for it.
Related
- Atlas HydroCorp — the owner
- The Board — contracts and projects